How To Guarantee Your Income With Agile Billing

Advertisement

For most creative professionals, this story is a familiar one: A client reaches out to you. They need a name, or a logo, or a website, or an app. Actually, they need it all together, and they need it all in a month — well, maybe a month and a half. The initial meetings go well, and they get you a signed contract and a deposit ASAP. You’re ready to start, and your schedule is clear for the next six weeks. And then you get the call.

“We won’t have the content you requested ready for another month.”

“Oh no,” you think. You were actually counting on that second half to pay your rent next month.

Take Control Of Your Finances

You may not be a sole proprietor. Perhaps you run a small boutique firm, or a large ad agency. Even if that’s the case, we all have similar problems: how do we pay our fixed expenses without knowing for sure when we’ll get paid by our clients?

Cash flow is the single most important thing for your business. Without money to pay rent and bills, the business will quickly spiral into Chapter 11. And if you’re a sole proprietor, the stakes are even higher: getting evicted from your office for a late payment is one thing, but if your business is run from a home office, you face the very real prospect of being homeless.

How We Usually Deal With The Cash Flow Problem

The most common way of dealing with uncertain revenue is to start with a lot of money in the bank, or enough credit to take out a loan if necessary. Angel investors, friends and family can help with the former. As designers and developers, we can also create things that bring us passive revenue, although that can become a full-time job in itself — and not necessarily a lucrative one.

Different billing practices require different approaches to ensure cash flow. Some of us charge hourly, while others do fixed per-project fees. The former need to estimate as accurately as possible in order to book enough hours to pay the bills, and some of them end up “churning,” or billing extra hours even if no substantial work is done. The latter must base their estimates on the assumption that every job will take the maximum amount of time possible, and try to work as efficiently as possible.

There’s a serious problem with both of these approaches, however: jobs almost always occupy more of our schedule than we expected.

Delays Cost Money

If the client says they’ll get something to us by Monday, more often than not it will arrive Wednesday, or Friday, or maybe even the following Monday. People are imperfect, and unsurprisingly, our clients have dozens of concerns in addition to our work for them.

We normally deal with this by agreeing to delay the date of the final product by an equivalent number of working days. But what happens when something gets delayed for a month, or two months, or six? We can’t reserve our time for one client indefinitely.

Unfortunately, most work-for-hire contracts do not contain explicit protections against client delays. The AIGA’s “Standard Form of Agreement for Design Services” notes this, but offers little in the way of guidance [emphasis is mine]:

“The danger for you as a businessperson is that an unexpected delay could mean that you’re temporarily unable to produce billable hours. To offset this risk, some creative firms attempt to charge a delay penalty or a restart fee. You may want to raise this issue as a negotiating point. However, most clients are not very receptive to the idea.”

Clients are understandably less than thrilled at the idea of paying to stop work. But that doesn’t mean we can’t protect ourselves against this risk while being up front and fair with our clients.

How To Negotiate A Better Contract

Contract negotiation is extremely difficult. Successful negotiation requires both keen insight into the other party’s needs and desires, as well as an understanding of all of the options available. The best negotiators are also experts at “logrolling“, i.e. trading assets in a negotiation in order to create more value for both parties.

Your initial discussion with a client will set the tone for all of your future negotiations. These talks will inevitably converge on one of two questions.

1. We Want X. How Much Will It Cost?

Anyone who’s ever used a home repair service will tell you to bring in a few people to get estimates before deciding on a contractor. Because we work in a service industry, we should expect the same treatment:

“How much for a website?”

“…What about just a logo?”

Most of our clients have no idea what to spend, for the same reason that we have no idea what to spend on a new roof: we’ve never built a house ourselves. Estimating construction costs is not in our skill set. These questions are the client’s way of sussing out our cost structure.

2. We Have $X. What Can We Get?

In government organizations and academic institutions, money is often earmarked before anyone knows what it will be spent on. Budgets are set aside for “IT”, “marketing” or “advertising”, and the client will have a price ceiling. This doesn’t mean they won’t try to get the best deal — just that they have a limit to their budget that may be less than you’re willing to accept.

Both of the questions above are based on the assumption that creative work can be delivered at a fixed cost. But in practice, each job is a unique problem and takes a variable amount of time to solve. What if, rather than pretending we know exactly what each job will cost, we embraced uncertainty and moved on?

Changing The Conversation

A wise man once said, “If you don’t like what’s being said, change the conversation.” In order for us to protect ourselves and our clients from the inevitable project delays, it helps to finish the initial consultation with a brief chat about our “terms of service.”

Below are my terms for mobile software development. They may inspire you to change your own contract. But whatever your terms look like, make sure they are clear and that you apply them consistently. Writing a Plain English explainer can help quite a bit with this.

Agile Billing Cycles

Instead of worrying about working enough hours or booking enough fixed-bid assignments for the year to pay our bills, we can choose to bill on a weekly, bi-weekly or monthly cycle. The system is based on scrum sprints: two- or four-week blocks of work during which a predetermined set of software features are implemented.

Agile billing addresses the concerns of both clients. Those with a fixed budget know they’ll get all the work their money can buy, and those without one know they won’t pay for more work than necessary. And when a client asks “How much?,” you can give them a range based on how many cycles a project of that size normally takes. If they need a firm number, you’ll need to work out a list of user stories or wireframes with them to determine a fuzzy estimate of how many sprints will be necessary (I use Pivotal Tracker for this).

Cycles are scheduled in much the same way as a magazine ad or sponsorship: weeks are blocked out and purchased in advance. During each cycle, we set aside a certain number of hours per day, part time, during which we make ourselves available to the client. It’s best to keep this to around four to five hours per day, which allows for both administrative overhead and a slight overlap between clients in case a job takes longer than expected. Explicitly limiting availability also prevents last-minute “marathon” sessions, which detract from the end product (and our sanity).

The 20- to 25-hour work week has another important benefit: it enables us to serve a limited number of additional clients on monthly retainers with a much lower time commitment. If a client is unsure about their start date, we can offer to add them to our monthly schedule until they figure it out.

Calling “Time Out”

There’s a big challenge when working on time-based billing cycles, however: clients often shy away from them, because if things take longer than expected, they end up paying for the difference.

Fortunately, we can address their concerns while protecting ourselves from too much exposure. We can allow the client to place a temporary stop-work order one day per week if something on their end takes longer than expected, and then we add those days to the end of the contract if necessary to complete work. This ensures that the client doesn’t shoulder any extra cost in the event of reasonable delays, while protecting our schedule from too much overlap.

Holds, Cancellations and Uncertain Start Dates

Sometimes a project gets cancelled or put on hold. In a “half-up-front, half-on-completion” scenario, mid-project cancellations can cause considerable friction if they happen early and the client feels they are owed some portion of the deposit back.

Freelancers, Stop Charging Hourly And Guarantee Your Income With Agile Billing
Image credits: The Oatmeal.

Agile billing deals with this by allowing clients to cancel a cycle in advance with a variable kill fee depending on how much notice they give. For example, one might allow a client to cancel a two-week cycle one week in advance at a cost of 25%, or up to three days in advance by paying 50%.

In addition, sometimes clients know what they want but aren’t sure exactly when they’ll be able to begin. In these cases, rather than provide free consulting services while they figure out how to proceed, we can offer to add them to our monthly retainer schedule and, in the meantime, assist them in the process with a smaller, more flexible time commitment.

How Much Per Week?

How much you charge per week will depend on multiple factors, including what the market will bear, your own costs, and what your competitors charge for similar services.

How Much Do You Want To Make?

While you should never compete solely on price, talk to a few of your colleagues who freelance to get a sense of what they bill clients. Multiply their hourly rate by around 1000 billable hours per year to get a sense of how much a typical freelance professional in your area bills per annum if they’re booked solid. (If you’re not a sole proprietor, multiply your colleagues’ agency rates accordingly.)

Once you have some realistic figures for comparison, decide how much profit you want to make per year, add your expenses, multiply the sum by 1.5 to account for holidays and low seasons, and divide by 50 to get your weekly rate. If you find that the hourly rate works out to double that of your colleagues’, you may need to revisit your salary expectations or slash some of your expenses.

Closing Thoughts

Most of us are naturally shy about discussing money. But we are professionals, and we merit the same level of financial stability as any other professional. Don’t be afraid to ask for a reasonable billing agreement that guarantees cash flow for you. Your clients, your business and your users will be better off because of it.

Other Resources

  • Design Is a Job, Mike Monteiro
    Monteiro breaks down budgeting, client relations and professional conduct in a well-written, acerbic tract on the business of design.
  • Negotiation Genius, Deepak Malhotra and Max Bazerman
    Two Harvard professors draw on decades of behavioral research and examples to explain the logic behind negotiation strategy.
  • Agile Software Development: A Gentle Introduction,” Don Wells
    A brief introduction to the agile process. While normally associated with software development, agile project management works well in any profession where people deal regularly with uncertainty.
  • Getting Real About Agile Design,” Cennydd Bowles
    Agile isn’t just for developers. This article on A List Apart explains why.
  • Agile Estimating and Planning, Mike Cohn
    Cohn quite literally wrote the book on agile planning for software development.
  • Agile Budgeting: Cash Is King” Jeff Magnusson
    Agile billing’s bespectacled, mathlete cousin, agile budgeting, enables you to keep a rolling estimate of expenses for the next few months, instead of sticking to a monthly or yearly budget.
  • 10 Contracts for Your Next Agile Software Project,” Peter Stevens
    An extended list of the different types of service agreements available. While this article presents them in the context of software, they apply equally to any service industry.
  • How I Went From $100-an-Hour Programming To $X0,000-a-Week Consulting,” Patrick McKenzie
    A good, if incomplete, guide to moving towards higher-paid consulting on a monthly retainer.

(il) (al)

↑ Back to top

Ben Jackson is an app developer and mobile strategy consultant living in Brooklyn, NY. He worked on iOS apps at the New York Times, and currently works on the Longform app. He loves technology and data reporting, and is a frequent contributor to BuzzFeed and other sites around the web.

  1. 1

    Interesting concept, it takes a lot of risk out of the project. I will try this approach on the next project I get! Thanks!

    0
  2. 2

    My recent strategy to keep cash flow steady when clients are late on their deliverables is to establish a fixed billing schedule based on the agreed development schedule. Clients can delay the project but they are still contracted to pay for the project at the previously agreed to date.

    I then move up the next project in the queue and work on that until the previous client is ready to resume.

    Scheduled payments + consistent work = steady cash flow.

    11
  3. 3

    Thank you very much for this great article. This kind of useful articles are the reason why Smashing Magazine is one of my favorite websites.

    1
  4. 4

    I make people pay a small deposit up front and the rest after completion. Most of my clients are 6+ months behind on getting pictures or content. It’s absolutely killing me!!! This came at just the right time.

    5
  5. 5

    This is very good practical article and would be a good extension for my article about agile:

    -3
  6. 6

    I’ve never thought to do it this way. Perhaps it is why I’ve decided to shy away from owning my own business. Anyways, thanks for the great article and insight!

    2
    • 7

      Same here. Reading this has given me ideas how to go about people enquiring for some programming work. Will definitely try this out at some point.

      0
  7. 8

    The projects we have are a fixed amount, 50% is paid up front and the rest is paid when the site is delivered, on the provision that there is no delay from the client side, inclusive of clients waiting on other third parties. We have a set delivery date depending on how long we estimate delivery will take and our invoice and service agreement clearly states that if the delays are not on our end the payment must be made with delivery or not. Of course if we are the reason for delay, we will renegotiate payment dates with the client (though we haven’t had to do this yet).

    Key is a solid contract, and being upfront about it.

    2
  8. 9

    Nice idea, how have clients reacted to this billing structure? Positive?

    0
    • 10

      So far? I’m still beginning to put this into practice, but the reaction has been quite positive when discussing the system with clients. I’ve heard similar stories from my colleagues who have tried billing on weekly or bimonthly schedules. Clients want great results at the best price; your main task is convincing them you’re the one for the job. If you do that, the rest of the process should just be finding common ground in the details of negotiations.

      4
      • 11

        Sooo….. you’ve not actually *tried* this in the real word, with real clients? Clients who delay delivering content are also the same clients who delay payment; invoice once a week if you want, but you’ll be getting paid once a month (if you’re lucky) by the finance department – who will often be completely separate from the department contracting your services.

        I can see this working in principle with smaller clients, but what’s wrong with a 50% deposit up front, and billing twice a month on the acruued remainder if the project goes over a certain length of time? Much easier, and you don’t need to keep count of all these little ‘day here, day there’ rollovers.

        Clients are simple people. Make the invoicing simple for them, and they’ll be happier, and more likely to give you the work.

        1
  9. 12

    Excellent article. I’d very much like to better understand the part about having additional clients on a “monthly retainer”, I’m not exactly sure what you mean. What are you charging them, and when, and for what?

    0
    • 13

      The monthly retainer schedule is an alternate billing option for situations where the client doesn’t need/want your full time and attention. The services you provide are up to you, but for me they usually include things like requirements definition, user research, wireframing, design critiques, and high-level strategic discussions with stakeholders.

      The cost of your retainer will vary greatly based on your experience and market demand, but a 50-100% markup on your normal hourly rate seems like a reasonable price window to me. The key point here is that the lower your time commitment to a client, the higher the markup should be, as each client comes with a fixed overhead expense in the form of time spent billing, prospecting, etc. Giving 20 clients an hour a month of your time is almost certainly not a great situation to be in unless you’re charging them each a thousand bucks for the privilege.

      1
      • 14

        The retainer situation is not working out lately. Maybe it is because we priced the retainer at half the hourly rate and intended it to be for updates and maintenance related requests plus a way to generate regular inflow of funds. The client would have their work escalated and completed asap. Then, over time, when requests were heavy, we changed it to do all the work at once so the client could see that an hour was indeed used, based on timestamps. They had questioned too often. Another situation, the client would not send requests for a while and several months down the line would expect that we remember they hadn’t done anything four months ago and they should have a time credit. UGH. Another situation, the client was sending requests that were obviously beyond the scope of retainer work and into quotable work yet expecting that it should be covered with their retainer. Demanding. A headache, for sure, all around.
        I am guilty of saying the following words in sheer frustration, “but, you only have one hour. One.”
        I’m definitely going to redefine the retainer to include “high-level strategic discussions with stakeholders” as that pertains to clients who call to micro-manage. The phone calls must stop. Plus, invariably at the end of many calls is a plea to do just one little thing. Just.One.Little.Thing.

        1
  10. 16

    Great article! Lots of information that can be useful if you’re a freelancer or just starting out building your business.

    0
  11. 17

    This is a great article and I will definitely implement this with my next client. Can you please expand on the one day temporary stop-work order? Im unclear how you would be compensated if it happens every week. Also do you have a sample contract that lays out these terms?

    Again, great article, thank you

    -dp

    0
    • 18

      There is no extra compensation with the temporary stop-work orders; they’re meant to be a courtesy to protect the client from their own delays. Think of it the same way a cash-only store treats sales tax, and build it into your pricing and scheduling.

      0
  12. 19

    Have you ever had clients complain about having to cut a check every week? Just curious. And what if the client’s financial department gets hung up or delivers the payment a few days late; while it’s not your direct report’s fault, do you still not continue with that week’s work until the check is in your hands?

    2
    • 20

      This totally depends on the client.

      I’m always somewhat flexible with precise payment terms during contract negotiations, as different companies have different policies with respect to accounts payable, and they are rarely as flexible as my one-man accounts receivable department. The important thing is to have some type of deposit or payment in advance to make sure you’re never left hanging at invoice time.

      0
  13. 21

    Great article, lots of useful information, we do some times and materials + extra hours packages which benefit the client on being able to control what they purchase. Not sure about the impact of including a monthly retainer tho, but certainly something that small or single operations can benefit from.

    0
  14. 22

    This is actually the darker side of the industry and a bitter fact that most of the small-sized web development companies make promises which they can never keep and frustrate the client unnecessarily. It moreover, dis-reputes an organization instead they should rather keep a transparency with their client in order to build themselves as a brand and earn more projects with healthy relationship and brand name.

    -1
  15. 23

    This article gives me the impression that clients would just feel nickle & dimed by a greedy freelancer (whether its true or not). Has anyone used this method? How did your clients feel?

    -1
    • 24

      How the client feels is entirely dependent on how you present yourself and your terms. If you’re clear, up-front, and transparent about how your billings are structured and why, I’d wager that clients will trust you more than the shop that sends them a fixed-bid quote with vague line items like “CMS: $35,000″.

      3
  16. 25

    We moved from web design to animated video and thought we wouldnt have this problem but when a customer takes two months to read a 2 min script we put an 8 week clause in the contract. The balance is due then unless delays are caused by us. It’s amazing how fast we get feedback when They know they have to pay either way.

    2
    • 26

      This helps, but what if they really, truly can’t get you the material on time? Do you end up pushing them to the back of your queue if there’s more work on your plate when they finally deliver?

      0
      • 27

        can’t or won’t?

        Behaviors are subject to natural selection just like any Darwinian evolutionary feature. In other words, if there is a cost of doing something (or benefit) then it will be done less (if a cost) or more (if a benefit).

        YOU MUST make good behavior more profitable for the client (discounts for early payment, fast turnaround) and slightly less favorable terms for long response times, late payments, etc.

        1
  17. 28

    The problem I see with this strategy is that you are forcing yourself to make less money in situations where clients have larger budgets.

    0
    • 29

      I’d argue two things:

      1. While your hourly rate may work out to more doing fixed bids on some projects, you may not actually be making more money on the whole if those contracts take up more of your availability than expected.

      2. In my experience — with software development at least — clients will generally opt for as much work as their budget will allow, rather than defining a fixed scope and then stopping development when it’s over.

      That said, even if you’re not doing software, if your client has a budget of X, you should know this before you send them an estimate.

      If you’re doing e.g., a corporate identity design, the chances of “finishing early” are close to nil, unless Parkinson’s law has ceased functioning. You can ALWAYS spend more time on user research, the usage manual, etc.

      2
  18. 30

    It took me 3 years attempting (and failing) to make a living on fixed budget contracts before I realized that agile billing is the only way to go.

    The problem with the creative industry is that “X” is often impossible to define, either by the client or the vendor. Ultimately the result is that it becomes impossible to define the cost of “X”. Is “X” going to be a quick and dirty process, or will it consist of weeks or months of revisions from the client? Will there be delays?

    Oh I wish I had read and understood this article years ago. If you are just starting out… This article is Gold.

    5
  19. 31

    I am just starting out and the hardest part I’ve had (aside from getting clients) is figuring out how to bill in a way that clients won’t be afraid of. I’ve been trying to concentrate on small businesses, but they seem to be a hard sell mainly because they have small budgets. This method may be helpful in convincing them that it really is affordable.

    I am wondering though, do you do more than one project at a time? For instance, you’ve given a client a week block with guarantees of a template, home page, contact form, and hosting setup. That shouldn’t take an entire week, so would you spread services to another client to help improve your income?

    0
    • 32

      As a rule, I don’t juggle more than one “full-time” commitment for more than a week or two. This promise helps make sure clients trust that they’ll get my full attention during their allotted time. At the risk of abusing a metaphor, if you have to double-book, you’re probably dating the wrong crowd.

      That said; if you find yourself regularly taking on jobs that merit a shorter sprint interval (say one week, instead of two), by all means bill in shorter periods. And if you have extra time, you’ll be better served by spending it doing business development instead of chasing after loose change.

      0
  20. 33

    I’ve started using this approach since the New Year, here’s the tale of my two current projects:

    For project #1, I didn’t hold my ground and accepted an hourly; I’m now more or less on call for this client (for less than 5 hours a week of work) and doing less interesting work.

    In project #2 I’m using an agile approach. I’m getting paid 5-10x total the value of project #1, the client feels they are getting a lot of value, and they respect my time immensely.

    Lesson learned: if they aren’t able to pay for at least a week of my time, the project isn’t interesting enough or meaty enough to warrant my services. And moving forward, if a client insists on hourly, then I’ll place a premium of 50-100% for this service.

    5
  21. 34

    This is a fantastic article. I’ve been self-employed for over four years now and still have troubles with finding the right way to bill, getting paid in time, etc. I still used fixed fees based on an estimate of my hourly rates. It doesn’t work too well though, I always spend more time on a project than I imagined and always have troubles defining what I charge for and what I charge extra for. In some cases that does end up with being quite disgruntled about the project overall.

    I really like this approach and in the long run it can definitely cause a more steady cash-flow. What I do think is that you re-he-eally need to be able to explain this way of working in a simple way. If you need 15 minutes to explain this to a client chances are they ask themselves ‘if the billing is already complicated, how complicates is the rest going to be?’

    I also think you have to give up a bit of flexibility for this way of working, especially when self-employed. I mean, you can’t promise a client blocks and let something else come in between, things like that. All and all a great post though, I will consider applying this.

    0
  22. 35

    Amazing article. Thanks for this Benjamin – it will really help me in the long run when I start to interface with clients.

    0
  23. 36

    Great article, and timely as well. I actually started implementing this exact same strategy with my last client, and the results were great.

    It’s far easier for you, and for the client. They know that in X amount of days/week they will have your undivided attention, and of course their product.

    In this particular case we did 2 x two week sprints, with a 3 day contingency in place should it prove necessary. The client knew that if for any reason the project couldn’t be completed in those two sprints that it was going to cost another X amount € to complete. The costing was clear and in black and white.

    In the end everything was done on time, even adding a day at the end due to unforeseen circumstances (as you mentioned).

    To anyone who hasn’t try this method I’d highly recommend looking into it.

    Cheers
    Nathan

    1
  24. 37

    Hi Jason!

    Thanks for this great post! I really like this billing method, I will try to use it on my next project.

    but I’m still confused by the “hours per day” you sell. How your clients feel about the fact you work “only” 5 hours a day for them for X000$ a week.
    I’m french, and in France, we work around 8 hours a day, it’s kind of a “norm”, and it could seams weird to work only 5 hours.
    Do you have any feedback on this?

    thanks

    Jeremy

    2
  25. 38

    Excellent article & I like your solution. I will try it when I return to freelance..some day. It was exactly the cash flow problem you describe which forced me out of freelance and into the corporate world, and think your solution might work.

    The only problem is, in my area (Sacramento/Folsom,CA), I have a really hard time finding clients willing to pay professional market value for web design and development. They always think it should be done dirt cheap. My skills are good and I have no problem finding a corporate job that pays what I expect (and actually requires less real work), but with freelance it is really hard to find clients with budgets that make the work worthwhile. The monthly retainer or weekly billing are a good ideas but many potential clients won’t go for that. I get very bored in the corporate job but it is very hard to return to freelance because I have never been able to get it to pay decent. I suppose it is because good development and design skills don’t mean I have good sales skills and of course in the corporate world someone else handles that for me (as well as PC, server and network support which I can do but took up tons of time when freelancing).

    The huge difference in wages really gets to me though. I have had to come to the conclusion that freelance for small businesses just doesn’t pay and the only way to make it with freelance is to be able to make big corporate sales. However, trying to do that took so much time, I had none left for development (plus add in doing your own tech and server support). I honestly don’t know how others do it. It seems like the only way is to have a team of at least 3 (sales, network/tech support & developer/designer) and go after big corporate contracts. I don’t live in a major city, so maybe that is the problem, or maybe I have been spoiled by good corporate jobs.

    Do you have any tips for making freelance pay and finding clients that will pay by the week as you describe (especially if you don’t live in a big city)?

    0
    • 39

      When I lived in Sacramento I had the same problem with potential clients. At least in that area, they are not willing to pay market rates for professional services.

      0
  26. 40

    Hi Jason,
    This sounds like a great approach and I have heard about it before. I really am inspired to try it – but I’m still having a hard time telling the difference this makes from my method.
    I use a retainer method. I set with my clients on a “weekly” hour base, and then I charge them by the end of each month.
    In my contract I have a “two week notice” part to kill the contract which can come from the client if he wishes. Almost all clients need a project of more than 2 weeks, so I just tell them “lets start off with a month of retainer work and in this mid month we can check in to see you’re satisfied”. So that gives me a month of hourly work and I know exactly how to fill up my 8 hour a day timeframe with no overhead… moreover a lot of startups want me working in their office so I have a rate for that as well.

    If a client calls me up and asks for a job – I let him know right away how many “weekly” hours I have left for the upcoming month.

    So can you please explain to me – what’s the benefit of your method over a good steady retainer method?

    Thanks a lot.

    0
  27. 41

    Very useful article. We currently fix a price for each site we develop then divide it by the timescale of the project with a payment scheduled every two weeks. However the fixed price nature of our model has bitten us on the behind too many times. I’m going to look at implementing this approach very seriously.

    Once the payment dates are agreed how do you go about ensuring the client socks to them? We have moved to taking control by using direct debit (via go cardless) before this we often waited ages to get paid because the client didn’t ” get around” to transferring the money. This has helped but I wonder if anyone else has found any good ways of ensuring they get paid on time?

    1
    • 42

      With one particular client, I actually had her write me 5 postdated checks of $500 each, with the agreement that I cash them on 2 week intervals after submitting the programming work according to the milestones.

      Each check was actually an advance payment for the NEXT piece of work.

      1
  28. 43

    Interesting article. This is a difficult subject to work around and I think your solution is great for the designer, but how do you sell it to the client? Do you explain to them the whole concept of agile sprints and how payments will be made face-to-face during the client brief or do you send them a document explaining it to them? It seems like a great alternative form of payment for us designers/developers who do understand what agile and scrum means, but for your average client, they would be left scratching their head in confusion.

    1
  29. 44

    I think you meant to multiply by 2000 billable hours/yr rather than 1000?

    0
    • 45

      2000x is for full-time employees who just punch the clock 40+ hours per week
      1000x is for contractors/freelancers, since there are tons of other non-billable things that eat up your time (bookkeeping, project management, sales, etc)

      0
  30. 46

    Interesting idea.

    At work.io we got a different approach. We are a freelancer marketplace with a focus on research and analysis. The buyer has to define with our editor what they need exactly and pay upfront. Freelancers with fitting skills get offered the task and can start to work on it immediately. That removes the overhead of contracts and acquisition. The provider also knows how much they will get for each part of the task.

    I am wondering if we could implement such a sprint based payment model for designers and developers. Removing some risks from the freelancer and the overhead of managing things. They would log in and see available work blocks. Of course we would be limited to projects that can be broken down that much and we would have to vet the people who get access to the provider market. But that is something we already do.

    0
  31. 47

    Thanks! Great article. I may have to print it out and hang it up.

    0
  32. 48

    I bill 25% up front, 25% after mock, and remaining after completion. I don’t really have a contract (and have never been shafted) but I do state that after a an amount of time I can bill for work done, so I might be able to bill for 35% of that remaining 50% if I like but it’s never come to that yet.

    Bottom line I keep busy with many irons in the fire. While I have two or three sites on the go I might be putting a logo, business card or even magazine together. Occasionally you might hit a low point in income or an overwhelming work load all the same, but 90% of the time it evens out and I work a regular work day, I just work on something else while others get their act together.

    Nothing is perfect and I guarantee agile billing isn’t perfect either, especially when you are serving businesses as big as your own one man company. I can guarantee most clients won’t get this style of billing and it sounds like an idea more to the tune of someone serving (luckily) pregressive clients with marketing budgets that aren’t also their grocery budgets.

    1
  33. 49

    Project Milestone Billing, “monthly retainers”, cash flow and client deliverables/approvals (and lack of same)

    One of the most dangerous situations you can get into is having a client contract where you.. “get 25 percent upfront, 25% after some milestone and so on until completion..”

    Why? Because we have not yet discussed TURN AROUND.

    What is that? Well Virginia, that is when you do ‘x’, you submit it to the client, they review and hopefully approve it and you get paid for that milestone and you proceed to the next milestone.
    Did your contract stipulate that they “MUST REVIEW AND APPROVE/REJECT WITHIN ‘x’ HOURS OR DAYS?”

    What if they never “get around to it?”

    You MUST, MUST, MUST have some kind of stipulation that covers that (very likely) possibility.

    Regarding the “Monthly retainer” concept, you have to (like you do everything else), SELL IT TO THE CLIENT.
    How?

    A simple analogy will suffice.
    You fly to Detroit and rent a car at the airport. You go off to visit your friends and mostly stay indoors the whole week. YOU STILL PAY THE SAME DAILY RATE FOR THE CAR.
    Granted, you really did not go anywhere, BUT THE CAR WAS READY TO TAKE YOU, WHEREVER, WHENEVER.

    *THAT* Is what the client is paying for! That high availability (not necessarily “transportation”). Many times, it is a matter of putting a nebulous concept (“intellectual property and ownership of digital downloadable materials” in terms that a client or user can identify with.

    Once you properly make the right analogy -and mental connection- people will have little trouble paying for possible access to you -WHETHER THEY USE YOU OR NOT.

    My favorite sales reference in these situations is a CELL PHONE PLAN.
    You pay for a certain number of minutes each month, there for you to use whenever you need to.

    2
  34. 50

    Do you know of any software available to schedule payments with clients? Any recommendations of software to use to have scheduled payments/reminders?

    0
  35. 51

    Really wonderful article. Brilliant work!
    Being a Scrum/Agile enthusiast, I keep searching for such articles related to Scrum/Agile and yours is superb. I have ready some wonderful discussions like the above one on http://www.scrum-master.info/discussionForum.asp .

    0
  36. 52

    Awesome article.

    Could you elaborate more on the “kill fee”. Is this is addition to the cost of the sprint? How do you justify the kill fee as opposed to just having the client forfeit the remaining part of that sprint?

    0

Leave a Comment

Yay! You've decided to leave a comment. That's fantastic! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or else it will be deleted. Let's have a personal and meaningful conversation instead. Thanks for dropping by!